TMK premium pipes first run into a well at the Sakhalin-1 project

A casing string made up of premium threaded connection pipes manufactured by TMK was successfully lowered into a well from the Berkut offshore ice resistant stationary platform at the Sakhalin-1 project’s Arkutun-Dagi field.

Read more at TMK PREMIUM PIPES FIRST RUN INTO A WELL AT THE SAKHALIN-1 PROJECT.

Leave a Reply

arrow
%d bloggers like this: