Thor™115 installed in the most efficient European power plant

Tenaris has been recently awarded a contract by AC Boilers, the largest Italian boilers manufacturer, to supply Thor™115 steel pipes to be used in the construction of the heat recovery steam generator installed inside the Edison Thermoelectric Power Plant at Marghera Levante.

Read more at Thor™115 installed in the most efficient European power plant.

Leave a Reply

arrow
%d bloggers like this: