• Follow Us

  • Continuous caster and secondary metallurgy facilities by Primetals Technologies receive FACs from MMKI

    In late March, Ukrainian steel producer PJSC “Ilyich Iron and Steel Works of Mariupol” (MMKI) issued the Final Acceptance Certificates (FACs) for a two-strand continuous slab caster, a twin ladle furnace with an alloying station, and the associated dedusting system, all supplied by Primetals Technologies. The two-strand caster CC4 is designed to produce 2.5 million metric tons of slabs per annum. This increases MMKI’s annual production capacity to around four million metric tons, as well as enhancing and expanding its product portfolio to include, for example, HC, UHC and ULC steels. A level 3 heat-pacing solution coordinates the steel production with the casting operation.

    Read more at Continuous caster and secondary metallurgy facilities by Primetals Technologies receive FACs from MMKI.

    Leave a Reply

    arrow
    %d bloggers like this: